Client National hydrocarbon organization of Albania

Within a gas producing oil field in Albania the client wanted to explain the low production rate of some wells and drill a new well with a higher production rate. After performing a high resolution PST survey of the region it appeared that the low production wells were in the vicinity of the anticline structure (see figure below were we plot all the formations with Vp>5.3 from 4Km upward). We proposed the position of the new well to be on top of the anticline and the obtained production rates were satisfactory.

Passive seismic case study